CSI Lighting Project. |
The Telamon Energy Solutions group was also selected by the Clay Township Trustee’s office to do an energy audit and energy reduction of their office building and fire station. By replacing over 300 65Watt floods with 14.5Watt LED bulbs they were able to reduce energy consumption by over 75%. Additionally, Clay Township was able to reduce the high bay 32Watt light fixtures with 22Watt LED bulbs. This action reduced energy consumption by 30% but reduced maintenance to replace the bulbs every 8 years as compared to annually, therefore increasing their return in investment even further. Mike Morley served as the designer and project manager.
The Energy Solutions team is excited to announce these two
great new clients.
-Bruce BreedenDirector of Business Development
Energy Solutions - Telamon Corporation
No comments:
Post a Comment